中间图

Or
综合推理IR-16959 【难度:其他】 Time Cost00:00
收藏
报告题目错误
请选择错误类型:
请描述一下这个错误:

取消

题目材料

Project

At a certain company, successful projects proceed through 8 stages-Stages A through H. An active project is one that is currently in one of these 8 stages. If a stage of a project is completed during a given day, the project is immediately moved to the next stage. At the end of each day, the current stage of each active project is recorded. Some stages require as little as 1 day of work, and none requires more than 3 days of work. A project is said to be delayed if it spends more time at a stage than is required to complete the work. If a project is canceled, the current stage for the day is recorded as Stage X, and the project is no longer considered an active project.

Stages and Clusters

For any given project, the diagram shows the progression of the stages of the project as well as the department of the individuals responsible for each stage. The stages-divided into the initial, intermediate, and final clusters-are each assumed to constitute some nominal fixed percentage (NFP) of the project's lifetime. In the diagram, each cluster percentage is the sum of the NFPs for the stages within the cluster.

GMAT、gmat题库、gmat模考、gmat考满分

A status history report-a report containing the daily project status for any project that was active within a given timeframe-is produced by a computer program. Below is the report that was generated at the end of the day today, which is the fifth day of Week 7. The report shows, for example, that Project 75039 began on the second day of Week 6, spent 3 days each in Stages A and B, and has been in its current stage, Stage C, for 3 days.

GMAT、gmat题库、gmat模考、gmat考满分


For each of the following projects, select Delayed if it can be inferred from the information in the tabs that the project must have experienced a delay at one or more stages. Otherwise, select Not necessarily delayed.

Delayed Not necessarily
74154
74854
75745
该题平均耗时:26.5s ,平均正确率:25%。 该题由网友kROe2L1D提供。更多GMAT题目请

网友解析

当前还没有完善解析,欢迎在这里提交你的解答,等待老师审核~
按钮 完善解答
按钮 完善解答

题目讨论 (如果对题目有任何的疑惑,欢迎在这里提出来,大家会帮你解答的哦~)

用户头像

游客

个人学习情况

用户名123

78

做题总数

20

知识点学习总数

8

累计学习天数
今日还需练习30
图标

离2018年08月31日的考试

还有142天

目标分

700分(V33、Q51)

雷哥GMAT微信

  • 微信图

    微信公众号:LGclub

  • 二维码

    Lindy老师:2095453331

  • 手机注册
  • 邮箱注册
登录>







关闭图标

标题图

  • 图标

    知识库学习

    GMAT语法、逻辑、阅读、数学各单项备考知识点学习及测验
  • 图标

    在线做题

    包含GMAT各单项必考知识点题目、OG/PREP/GWD/雷哥讲义题目、难度650/680/700/730题库题目练习及题目解析
  • 图标

    在线模考

    语文套题/数学套题/全套仿真模考,包含GWD/PERP/精选模考等上百套套题模考
  • 图标

    在线测评

    适合5种不同基础的GMAT学员,测评后可自动出具分数报告及复习计划指导
  • 图标

    资料下载

    GMAT必备备考资料下载、鸡精下载、课程课件等免费下载
  • 图标

    课程学习

    注册会员后,可在GMAT课程区,选择免费直播课程及公开课程进行在线学习
×
请你选择你要查看的模考成绩单
加载图片
网络异常